CAPABILITY 07 ยท TIER 2

Change Portfolio and Governance

A shift in behaviour, not a workstream to complete.

Start free diagnostic All eight capabilities
FROM

Competing initiatives

TO

Protected capacity to absorb change

Why it comes in when it does

TIER 1TIER 2TIER 3

The Portfolio Governance Charter must be signed before any wave enters build. Retrofitting portfolio authority after saturation is politically difficult and always delayed.

In practice

Saturation thresholds are agreed in a charter before an active wave arrives, with an advisory level and a mandatory review level. Portfolio health is assessed weekly. When a population crosses the advisory threshold, a notice is issued and that population's wave timeline is adjusted.

What it looks like when it is missing

F3Measurement without governance authorityThe measurement is accurate and current and the dashboard shows what is happening in near real time, but nobody is authorised to act on it. A signal declines for three consecutive cycles, goes to the steering committee as information, and is noted.The rule. Capability 7 activates before any wave enters build, so the charter that gives governance the authority to act is signed before saturation pressure arrives.
F6Culture without a saturation limitThe cultural norm protocol is well designed and detecting real patterns. Then the portfolio saturates: several waves active, people on leave, coaching sessions rescheduled and never delivered. It looks like a culture problem and is a portfolio governance problem.The rule. Culture governance activities appear explicitly in the portfolio charter with protection status, so they do not slide when the programme is under pressure.

Instruments it leans on

The platform assigns each of the 26 instruments to one capability as its lead and one as its supporting capability. This is where this capability sits.

LEADS (5)
SA-3Portfolio and Capital DisciplineSA-5Change Portfolio GovernanceAIP-3Parallel Process EliminationLR-2Recalibration Governance and CadenceLR-6CPI Review Template and Governance Pack
SUPPORTS (4)
SA-6Ethics, Risk and Guardrails ArchitectureLR-3Continuous Performance Maturity IndexLR-4Organizational Learning CaptureLR-5Governance Reallocation Decision Log

See all 26 on the instruments page.

Works with

It is read together with these capabilities, because the signals only mean something in combination.

The kit measures and governs, and none of it forecasts an outcome. See all eight capabilities.

See how it reads on your programme

Ten questions, an indicative readiness band, and a starting path. Returned on screen, no call required.

Start free diagnostic See the library